ARI SHIPYARD SEABED DREDGING PROJECT
Location : Yalova, Turkey
Period : 05.2024 – 12.2024
Employer : ARI SHIP INDUSTRY INDUSTRY AND TRADE LTD. CO.
Contractor : LCM ROTA CONSTRUCTION AND MARITIME TRADE LTD. CO.
- Within the scope of the project, 73,000 m³ of seabed dredging and dumping work was carried out.
- The shipyard maneuvering area was dredged to -7.00 meters elevation.
- Engineering calculations and bathymetry measurements were made.