Coastal and Port Construction Solutions

SAKARYA GAS FIELD DEVELOPMENT PROJECT PHASE 2

 

Location                : Zonguldak, Turkey

Period                   : 07.2024 - 09.2024

Employer                : TP-OTC (TURKISH PETROLEUM OFF-SHORE TECHNOLOGY CENTER)

Main Contractor       : SAIPEM S.p.A.

Contractor                : ARAS DENİZ İNŞAAT A.Ş. (ARAS MARINE CONSTRUCTION INC.)

Subcontractor          : LCM ROTA CONSTRUCTION AND MARITIME TRADE LTD. CO.

  • Within the scope of the project, 50,000 m³ of channel dredging work was carried out.
  • Channel dredging was carried out from -6.00 meters to -19.20 meters in the sections of kilometers KP333-KP600 and KP900-KP1260 of the natural gas pipeline.
  • Slope arrangement and cuttings were made.
  • The material from the channel dredging was discharged to the designated coordinates for reuse.