SARAYBURNU PARK UNDERWATER CONCRETE AND RIPRAP CONSTRUCTION
Location : Istanbul, Turkey
Period : 08.2022 – 11.2022
Employer : ISTANBUL METROPOLITAN MUNICIPALITY
Contractor : KUDAY RESTORATION CONSTRUCTION CONTRACTING AND TRADE LTD. CO.
Subcontractor : LCM ROTA CONSTRUCTION AND MARITIME TRADE LTD. CO.
- A total of 765 meters of quay was constructed.
- For the purpose of quay construction, 3,500 m³ of sulfate-resistant ready-mixed concrete was placed underwater.
- In accordance with approved project drawings and technical specifications, a riprap structure was made using a total of 3,500 tons of stone in different sizes and weights.
- The manufacturing of 146 protective prefabricated concrete blocks was completed and placed underwater with the support of divers.